Redstart were retained to undertake remediation and enabling work for a residential development comprising 41No. low rise residential dwellings and 1No. Multi-Storey apartment block
Key information
Service:
Geo-Environmental Consulting / Demolition / Remediation
Project:
Former Paper Mill and Mill Pond
Location:
Chinley, Derbyshire
Overview
Management of dense vegetation and tree clearance; Supervised excavation and removal of soils impacted by invasive plants. Further intrusive ground investigation works and reporting; Further stockpile testing and waste classification prior to removal from site of excess materials; Background Asbestos reassurance air monitoring; Pre demolition Asbestos surveys; Permitted demolition of existing Chimney, brick shed and bridge structures; Site turn-over and Geotechnical re-engineering of the 1.4Ha area to form a suitable construction platform, specifically; Preparation of the site for various foundation solutions (Driven piles and Raft Foundation); Importation and placement of geo-grid where required; Geotechnical testing to confirm geotechnical engineering specification achieved; Validation sampling to confirm material retained on-site posed no unacceptable risk to the residential end users, controlled waters or wider environment; Surveying of constraints and as built levels;
Let's discuss your project
If you'd like to get in touch please call us to discuss your project.
+44 (0)161 260 1333
However if you'd prefer to use the enquiry form please send us your details and we will get in touch with you.