Redstart was retained to complete placement of regulating soils and final capping of No. H2 Teesport Landfill.
Redstart was retained by Praedius to prepare the Canning Town Site for redevelopment of a high rise tower block and data centre.
Redstart undertook asbestos removal, demolition & remediation and enabling works at this former mill site.
Redstart was retained by SISK to complete cement stabilization of an access road to an industrial site.
Restart were retained to carry out Lime stabilisation and Enabling Works for a Commercial development.
Redstart completed embankment engineering works to stabilise a landfill required to discharge planning conditions for a change of land use.
Redstart managed the delineation and removal of Asbestos Containing Material and undertook verification works.
A phased ground investigation was required to assess contaminated land and locate historical mine shafts.